




Buy anything from 5,000+ international stores. One checkout price. No surprise fees. Join 2M+ shoppers on Desertcart.
Desertcart purchases this item on your behalf and handles shipping, customs, and support to Thailand.
🎬 Elevate your home entertainment—because 1080p perfection deserves the best cable!
This 5-meter HDMI v1.4 cable delivers high-speed data transfer with Ethernet and ARC support, ensuring crystal-clear Full HD 1080p video at 60Hz and immersive 3D and surround sound compatibility. Featuring gold-plated connectors and double shielding, it guarantees reliable, interference-free performance across a wide range of devices including gaming consoles, TVs, and PCs. Durable and officially licensed, it’s backed by a 2-year warranty for peace of mind.



P**L
Great product, Great service
Great product, Great service
M**Y
Ideal
Initially bought one cable, so impressed with the quality I've now bought two more.The first one was repeatedly rolled out to plug in across a doorway, then coiled up till the next time. It still coiled nicely, & didn't seem affected by its almost daily ritual (I did, I've now moved the TV)Would definitely recommend and buy again
M**K
Does the job
Appears well made, I used this to run from my sky box to outside to have a projector outside in the summer months, (I know I won’t need it for long in the uk) but hopefully it lasts
C**E
Great for games consoles
Purchased to run a lead from my 5 year olds xbox one to TV as wanted the xbox on top of wardrobe so he couldn't reach the console as he enjoys games for his age but not old enough to be responsible of changing games unsupervised. This is a thick cable too and quality is not altered in any way. Would highly recommend.
D**R
Excellent
Unfortunately it stopped working after 3 days so it was returned very disappointed
E**Y
Cables
They are what was described and do the job. Good value at the price
P**N
DO NOT BUY THIS CABLE
This cable (25m) is total garbage and does not work. Stupidly I didn't test it prior to needing it for a presentation so I've had it too long to send it back. This is the very old standard of HDMI cable (v1.4), which again stupidly I didn't check before I purchased it, so it can't work on the distances they are selling. Could not even get a 720p signal down it. Tested on multiple PC's, laptops, screens and projectors, which all work with other long cables I've purchased. Total waste of money. I give myself 1 star too for not checking.
O**E
Good product
Product as described no loss of signal. Highly recommended
Trustpilot
2 months ago
3 weeks ago